Services
Shediac SCADA system upgrade
Crandall was engaged in 2015 to complete an upgrade of the town’s existing control system, which integrated controls for 5 production wells and a water treatment facility. Services were maintained throughout the transition. In addition to the control system design and integration, Crandall also assisted the town in the specifications, selection and ordering of hardware, including programmable logic controllers, SCADA servers, software and alarm notification software.